Ir arriba
Información del artículo en conferencia

Offshore wind farm preventive maintenance scheduling in a deregulated power system

P. Mazidi, Y. Tohidi, M.A. Sanz-Bobi

International Colloquium on «Large Wind-Power Plants: Interaction, Control and Integration» - WINDFARMS 2017, Madrid (España). 31 mayo - 02 junio 2017


Resumen:
This study offers a preventive maintenance scheduling model for an offshore wind farm in a deregulated power system while distinguishing between each wind turbine. The model is a bi-level programming which is transformed into a single-level programming by applying Karush-Kuhn-Tucker conditions. Multiple constraints such as transmission limitation, maximum available power for each power plant, wind and wave height limitations, three maintenance mediums (two boats and one helicopter) and their characteristics, wake effect, work shifts, integration of condition monitoring systems and unexpected failure rates are considered. In order to demonstrate applicability of the proposed model, several case studies are defined.


Palabras clave: Bi-level Optimization; Maintenance Scheduling; Deregulated Power System; Offshore Wind Farm


Fecha de publicación: 31-may-2017


Cita:
P. Mazidi, Y. Tohidi, M.A. Sanz-Bobi, "Offshore wind farm preventive maintenance scheduling in a deregulated power system", presentado en International Colloquium on «Large Wind-Power Plants: Interaction, Control and Integration» - WINDFARMS 2017, Madrid, España, 31 mayo - 02 junio 2017

    Líneas de investigación:
  • *Planificación Táctica a Medio Plazo
  • *Modelado, Simulación y Optimización
    Grupos de investigación:
  • Instituto de Investigación Tecnológica (IIT)

IIT-17-067A_abstract

pdf Solicitar el artículo completo a los autores